News

Drive & Shine Illinois Road: Project Spotlight

DriveShine.png?Revision=NpX&Timestamp=7vPL78

Drive & Shine's Illinois Road location showcases how architectural glass transforms commercial car wash design. The 26,000-square-foot facility features a climate-controlled space where customers can detail their cars year-round.

562031dc4c81bdef56c6ec1b829c1dab.jpg?Revision=jpX&Timestamp=RCPL78

AGA's Work

AGA installed approximately 5,250 square feet of glass and aluminum systems in a distinctive patina green finish: the color of aged copper, similar to the Statue of Liberty.

d98297bc7def0f2b3564582de99805ea.jpg?Revision=YpX&Timestamp=ctPL78
Systems Installed:
  • Curtain Wall: 2-1/2" x 7-1/2" Tubelite with butt-glazed vertical joints and steel-loaded members for structural support
  • Exterior Storefront: 2" x 4-1/2" Tubelite, thermally broken, with custom X-pattern muntins on select units
  • Interior Storefront: 1-3/4" x 4-1/2" Tubelite, center glazed
  • Doors: 9 aluminum storefront doors with hardware and closers
  • Glass: 1" insulated low-e units with evergreen tint on exterior; 1/4" clear on interior


Technical Highlights

The main curtain wall section required steel-loaded vertical members due to its height, adding complexity to the installation. 

Butt-glazed vertical joints create clean, continuous sightlines across the glass expanse while demanding careful attention to detail from the installation crew.

The 7-week installation was completed by a crew of 2-6 members working with general contractor Witwer Construction and architect Joseph A. Dzierla & Associates, Inc.

b1101fe62f3718312903bcc2f80a1185.jpg?Revision=wpX&Timestamp=yDPL78


2cd811b0cab79f44f6518d27ab049467.jpg?Revision=GpX&Timestamp=BQPL78

The Result

The custom patina green finish and X-pattern muntins give the building a distinctive appearance that stands out from typical car wash construction. 

The extensive glass allows natural light to flood the indoor detailing bays.


Project Details 

Location: Fort Wayne, Indiana
Completion: December 2025
Glass Area: ~5,250 sq ft
Installation Time: 7 weeks

Project Team 

General Contractor: Witwer Construction
Architect: Joseph A. Dzierla & Associates, Inc.
Glass & Aluminum: AGA (Architectural Glass & Aluminum)


View our work →